TM 9-2330-381-14
13.
Maintain tension on lifting strap (2) with lifting device (4).
14.
Apply antiseize compound to upper cylinder pin (14) and bushing (13). Install a V-ring seal (15) onto upper
cylinder pin (14) and V-ring seal (16) onto bushing (13).
15.
Hand install upper cylinder pin (14) through gooseneck mounting lug (1) until pin is partially started into bearing
on gooseneck cylinder (3).
CAUTION
When driving upper cylinder pin through cylinder and mounting lug on gooseneck,
use caution so that the pin is driven in straight or cylinder bearing may turn the pin
and cause damage to upper cylinder pin or V-ring seal.
16.
Drive upper cylinder pin (14) through gooseneck mounting lug (1) and upper bearing on gooseneck cylinder (3).
17.
Aline hole in end of upper cylinder pin (14) with gooseneck mounting lug (1) and secure upper cylinder pin (14)
with washer (12), lockwasher (11), and bolt (10). Use a torque wrench to torque bolt (10) to 325 - 375 lb-ft (441 -
509 Nm).
18.
Install bushing (13) onto upper cylinder pin (14) and secure with self-locking screw (8). Use torque wrench to
torque screw (8) to 100 - 110 lb-ft (136 - 149 Nm).
19.
Install lubrication fitting (17) into upper cylinder pin (14).
20.
Lower lifting device (4) and remove lifting strap (2).
21.
Unwrap lifting strap (2) from gooseneck cylinder (3).
22.
Remove caps/plugs and install three hydraulic lines (7) onto gooseneck cylinder (3) and three hydraulic valves
under platform. Install block clamp (6) and screw (5).
23.
24.
25.
hydraulic lines.
Change 3 5-115