TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
NOTE
Do not place cable between tensioning device pulleys.
(15)
While Soldier A continues to pay out winch cable (9), Soldier B routes
cable through cable guide (11), over sheave (12), between roller (13),
and side of cable guide.
Change 3