TM 9-2330-371-14&P
BOGIE ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION CONTINUED
11.
Lifting rings (5)
Rear of semi-
a. Using hoist, lower until support
trailer (1)
brackets (7) are within approxi-
mately 1 inch (25 mm) of trunnion
cross tube brackets (8).
b. Line up boltholes (9) in support
brackets (7) with boltholes (10) in
trunnion cross tube brackets (8).
12.
Support brackets
Eight bolts (11),
a. Screw in and tighten, using 1 5/8-inch
(7) and trunnion
Iockwashers (12),
socket, handle, and 1 1/2-inch wrench.
cross tube
and nuts (13)
It maybe necessary to jack up
brackets (8)
trunnion cross tube brackets (8) to
seat support brackets (7).
b. Tighten nuts (13) between 450 and
650 ft-lb (610 and 881 NZm) using
13.
Rear of
a. Take out two safety support
Safety support
semitrailer (1)
stands (4)
stands (4)
b. Lower semitrailer (1) until sling (14)
is loose.
c. Take off sling (14).
TA224318
5-9