TM9-2330-374-14&P
Installation.
b.
press contacts closer together.
(2) Check switch (1) for loose contact.
(3) Install door on circuit breaker load center (4).
4 - 1 5 .
CIRCUIT BREAKER LOAD CENTER AND SWITCH BOX
INITIAL SETUP
Tools
General mechanics tool kit
WARNING
D i s c o n n e c t all outside power before performing any
maintenance on the electrical system. Failure to do so
could result in serious injury or death.
Removal.
a.
(1) Remove door on circuit breaker load center (4, figure 4-1). Open door (2)
on switch box (12).
(2) Disconnect all internal wiring and tag for ease of installation.
(3) Remove wire run covers (6) at top of load center (4).
Slide off
(4) Remove caps (7,8 and 9) in the circuit breaker load center (4).
of wiring.
(5) Remove caps (10 and 11) in the switch box (12). Slide off of wiring.
(6) Remove close nipples (13 and 14) from top of load center (4).
(7) Remove locknut (17) at bottom of load center (4). Slide off of wiring.
(8) Remove two locknuts (15 and 16) in the switch box (12). Slide off of
wiring.
(9) Remove rigid coupling (20).
(10) Remove four screws (18) securing circuit breaker load center (4). Remove
circuit breaker load center (4).
(11) Remove four screws (19) securing switch box (12). Remove switch box (12).