TM 9-2330-381-14
4-59.
PLATFORM STEPS AND SERVICE COVERS (CONT)
FOLLOW-ON MAINTENANCE
1.
2.
4-60.
LOADING RAMP
This task covers:
a. Removal
c. Installation
b. Inspection
d. Adjustment
INITIAL SETUP
Tools
Chain, 5/16 inch link, item 9, appx. B
General mechanics tool kit, item 16, appx. B
The following tools can be found in common tool kit no. 1, item 17, appx. B:
Degreaser tank, 20 gl
Gloves, chemical and oil protective
Sledge hammer, 12 lb
Goggles, industrial
Wrench, pipe, adjustable
Material/Parts
Antiseize compound, item 3, appx. E
Cleaning compound solvent, item 25, appx. E
Wood block, 2-inch x 4-inch
Lock nut (4)
Cotter pin (2)
Lockwasher (4)
Personnel Required: 3
Equipment Condition
Gooseneck lowered to lowest position, if uncoupled (para. 2-18)
Crowbar and isolation valve handle extension removed (para. 1-9)
General Safety Instructions
WARNING
Do not stand behind the ramps or in the path the ramps can travel when being
lowered and raised or serious injury to personnel may result.
4-292