TM 9-2330-383-14&P
NOTE
Tighten left side wheel nuts counterclockwise and right side wheel nuts
clockwise.
(3)
Tighten lug nuts in the order shown.
(4)
Lower trailer and remove jack.
(5)
Remove chocks from opposite wheels.
(6)
(7)
As soon as possible, have unit maintenance torque nuts to 450-500 lb
ft.
END OF TASK
3-15