TM 9-2330-386-14&P
4-44 FLOAT PADS(GROUND BOARD ASSEMBLIES) (CONT).
b.
Installation.
NOTE
See Appendix G for chain fabrication details.
(1) Install S-hook (8) on bracket (9).
(2)
At curbside of semitrailer, place
chain (7) end link on S-hook (8).
(3) Squeeze both S-hook (8) ends closed.
(4) Slide chain (7) end link between
float pad (6) and end of handle.
(5) Insert capscrew (5) through end
of handle, chain (7) end link,
and float pad (6).
Install washer (4) and nut (3).
(6)
P o s i t i o n s n a p h o o k ( 2 ) o n m i d d l.e
(7)
link of chain (7).
A t storage box side of semi-
(8)
trailer, position snap hook (1)
on end link of chain (7).
S q u e e z e snap hooks (1 and 2) cl osed.
(9)
( 1 0 ) At storage box side of semi-
trailer, hook snap hook (1) clasp
on S-hook (8).
(11) Stow float pad (6) in brackets
with handle down.
(12) Take up slack in chain (7) and
hook snap hook (2) clasp in
position.
TASK ENDS HERE
4-84