TM 9-2330-386-14&P
4-45 LANDING GEAR (CONT) .
(5) If removed, install drive shaft (24) on landing leg (23) shaft.
(6) Aline holes in drive shaft (24) with hole in landing leg (23) shaft.
(7) Install capscrew (19) and lock nut (18).
(8) Repeat steps (2) through (7) to install other landing leg (23).
(9) Install two braces (17), capscrews (15), four washers (16), and two lock
nuts (14). Do not tighten lock nuts (14).
(10) Install brace (13), two capscrews (11), four washers (12), and two lock
nuts (10). Torque lock nuts (10 and 14) to 50 lb-ft.
e.Sand
shoe
Installation.
(1) Install shoe (9) and axle (8) on landing leg (23).
(2) Install capscrew (7) and locknut (6).
(3) Repeat steps (1) and (2) to install other sand shoe.
f. C r a n k
Installation.
(1) Position hand crank (5) on gear box shaft (29) and aline holes.
(2) Install washer (4), capscrew (3), washer (2), and lock nut (1).
(3) Check operation of landing legs.
(4) Lower landing legs fully and stow hand crank (5) in hanger (30).
( 5 ) Remove jack stands and stow wheel c h o c k s .
TASK ENDS HERE
Section X. BODY MAINTENANCE
Para
Para
Floor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-49
Bulkhead Chains . . . . . . . . . . . . . . . . . . . 4-46
Storage Box Chains . . . . . . . . . . . . . . . . 4-50
Side Panels . . . . . . . . . . . . . . . . . . . . . . . 4-47
Mud Flaps . . . . . . . . . . . . . . . . . . . . . . . . . 4-48
Manifest Box . . . . . . . . . . . . . . . . . . . . . . 4-51
4-46 BULKEKAD CEAIHS.
This task covers removal and installation.
INITIAL SETUP
Tools
General mechanics tool kit
4-87