TM 9-2330-386-14&P
4-46 BULKHEAD CHAINS (CONT) .
a. R e m o v a l .
(1) Remove split ring (4) and pin (1)
from chain (3) .
(2) Remove screw (2) and chain (3).
(3) Repeat steps (1) and (2) as
required for other pins and
chains.
b. Installation.
NOTE
S e e Appendix G for chain
fabrication details.
(1) Position end of chain (3) on
b u l k h e a d and install screw (2).
(2) Install end of chain (3) on
split ring (4).
R e p e a t steps (1) and (2) as
(3)
required for other pins and
chains.
TASK ENDS HERE
4-47 SIDE PANELS.
This task covers disassembly, repair, and reassembly.
INITIAL SETUP
Tools
Equipment
Condition
General mechanics tool kit
S i d e panels removed.
N o . 1 common tool kit
a. Disassembly.
(1) Remove screw (1) and pin (2) from stake (4).
(2) Remove seven screws (3) and stake (4) from plywood panel (8).
4-88