TM 9-2330-386-14&P
4-49 FLOOR (CONT) .
b.
Installation.
NOTE
The cut ends of boards (1) must be centered on a
crossmember(3)
(1) Place board (1) into position on crossmembers (3).
(2) Drill 9/32-inch diameter holes through board (1) and crossmembers (3).
(3) Install screws (2).
(4) Repeat steps (1) through (3) for remaining boards (1) that were removed.
TASK ENDS HERE
4-50 STORAGE BOX CHAINS.
This task covers removal and installation.
INITIAL SETUP
Tools
General mechanics tool kit
NOTE
This procedure is typical for the tarpaulin box or tool
box.
4-91