TM 9-4110-255-14
4-34. CONTINUOUS DUTY SOLENOID K5 TESTING AND REPLACEMENT .
This task covers:
a. Testing
b. Removal
c. Installation
INITIAL SETUP
Materials/Parts:
Equipment Conditions:
Lock Washers (2)
Refrigeration unit shut down (para 2-7) and battery
Self Locking Nuts (2)
Control box cover door raised and latched.
Marker tags (4)
(1) Be sure battery has been disconnected then remove two bolts (1) and lock washers (2). Open control
panel (3). Discard lock washers.
NOTE
Terminal hardware is supplied with continuous duty solenoid.
(2) Tag wire leads (4) and remove nuts (5), lock washers (6) and wire leads.
4-87