TM 9-4120-371-14
a. Inspection
Preliminary procedure: Remove junction box. (See para 4-47.)
(1) Check for general condition and signs of leakage. If leakage is suspected, leak test per paragraph
5-9.
(2) Check that mounting hardware is secure.
b. Removal
Preliminary procedure: Remove compressor. (See para 5-20.)
(1)
(2) Using screwdriver, remove two screws and lock washers from receiver bracket.
(3) Remove receiver bracket.
(4)
Purge the system with nitrogen and debraze the tube connections. (See para 5-7 and 5-8.)
Remove the receiver.
(5)
c. Installation
Place the receiver on the tube ends, purge the system with nitrogen, and braze the tube joints.
(1)
(2)
Using a screwdriver, secure the receiver bracket to the casing side panel with two screws and lock
washers.