TM 9-4120-385-14
11. Install junction box with control panel and tighten four captive screws.
12. Install lower panel and tighten two panel fasteners.
13. Install canvas cover and secure with sixteen screws and rain seal washers.
5-14. EXPANSION (QUENCH) VALVE