TM 9-4120-401-14
5 - 2 4 . EXPANSION VALVE. - continued
(7) Debraze tube connection (10) from expansion valve (9). (See paragraph 5-14.)
(9) Install expansion valve (9) and tubing into unit.
(10) Braze tube connections (8) and (7) to expansion valve (9). (See paragraph 5-14.)
(11) Insert thermal bulb (4) into thermal bulb clamp (6) and tighten hardware.
(12) Secure capillary tubing coil to tubing with plastic tiedown strap (5).
(13) Wrap insulation around thermal bulb (4).
(14) Install locking plate (3) in unit and secure with two screws (1) and lock washers (2).
NOTE
FOLLOW-ON MAINTENANCE: