TM 9-4935-481-14-1
Table 3-11. DMS-D Performance Test-Continued
STEP
UNIT
PROCEDURE
CORRECTIVE ACTION
400
ITP
Set the INTERNAL TEST and SEQUENCE switches to the positions indicated and observe the DMM
PPE
reading for each series of switch settings.
TNTERNAL
TEST
SEQUENCE
Reading
401
3
ALIGN 3
9.907 to +10.01 Vdc
(47)
403
ALIGN 5
+4.201 to +4.227 Vdc
(48)
404
ALIGN 6
+4.201 to +4.227 Vdc
(49)
405
4
ALIGN 3
+9.907 to +10.01 Vdc
406
ALIGN 4
+9.907 to +10.01 Vdc
407
ALIGN 5
+9.907 to +10.01 Vdc
408
ALIGN 6
+4.039 to +4.079 Vdc
Corrective action for steps 405 through 408 is: Replace
card A3. Check A3 pins 40, 87, 93, 117 and 118.
3-90.1/(3-90.2 Blank)