TM 9-2330-227-14&P
BLACKOUT PANELS - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Install insulation as necessary (page 4-173).
TASK ENDS HERE
SCREENS
This task covers:
INITIAL SETUP
Tools - Continued
Tools
Stepladder
Hammer, hand, ball-peen, 2-lb
Pliers, slip-joint
Personnel Required
Punch, drive-pin, 1/8-inch
Punch, drive-pin, 3/16-inch
One
Screwdriver, cross-tip, number two
Screwdriver, flat-tip, 3/16-inch
4-163