Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2330-285-14-P0152
REAR AXLE BEAM
TM-9-2330-285-14-P Dolly Set Lift Transportable Shelter 3-Ton M720 (NSN 2330-00-912-4251) Manual
Page Navigation
137
138
139
140
141
142
143
144
145
146
147
TM
9-2330-285-14&P/TO
36A11-21-10-1
FRONT
AXLE
BEAM -
CONTINUED
ACTION
LOCATION
ITEM
REMARKS
NOTE
FOLLOW-ON
MAINTENANCE:
1.
Install
steering
knuckles
(page
4-69).
2.
Install
shock
absorbers
(page
4-152).
3.
Install
steering
arm
(page
4-76).
4.
Install
air
chamber
(page
4-120).
5.
Install
master
cylinder
(page
4-1
16).
6.
Install
hydraulic
brake
lines
(page
4-104).
7.
Install
hydraulic
pump
(page
4-163).
8.
Install
relay
valve
(page
4-120).
9.
Install
brake
chamber
tee
(page
4-126).
10.
Install
intervehicular
air
hoses
(page
4-120).
11.
Install
safety
chains
(page
4-148).
12,
Install
data
plates
(page
4-162).
13.
Install
reflectors
(page
4-158).
TASK
ENDS
HERE
4-85