TM 9-2330-371-14&P
BOGIE BRACKET - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
INSTALLATION CONTINUED
NOTE
FOLLOW-ON MAINTENANCE: Install bogie
TASK ENDS HERE
Section VI. SPRING MAINTENANCE
Page
Page
Lower Torque Rod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42
U-Bolts, Saddle, and Spring . . . . . . . . . . .. . . . . . 5-24
Upper Torque Rod . . . . . . . . . . . . . . . . . . . . . . . . . .5-38
Spring Seat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-29
U-BOLTS, SADDLE, AND SPRING
This task covers:
INITIAL SETUP
Materials/Parts
Tools
Blocks assembly
Chain
Hammer, soft heavy
Hoist, 10-ton lifting capacity
Personnel Required
Jack, 20-ton, hydraulic, dolly type
Two
Socket, 1 7/16-inch, 3/4-inch
drive
Socket, 1 3/4-inch, 3/4-inch drive
Equipment Condition
Torque multiplier w/folding handle
Wrench, torque, 600 ft-lb capacity