TM 9-2330-381-14
PARA. NO.
TITLE
....................................... Fuel Tank Assembly
....................................... Fuel Filter Assembly
....................................... Engine Priming System
....................................... Mechanical Throttle Control
....................................... APU Control Box
....................................... Engine Exhaust
....................................... Radiator
....................................... Fan Belt
....................................... Fan Dynamo
....................................... APU Jump Start System
....................................... Starter
4-21.
GENERAL
This section contains those tasks to be performed by unit maintenance personnel.
4-22.
GOOSENECK COMPONENT ASSEMBLY
This task covers:
a. Removal
c. Inspection
e. Assembly
b. Disassembly
d. Repair
f. Installation
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
The following tools can be found in common tool kit no. 2, item 18, appx. B:
Electrical repair kit
Measuring tape
Extension light, 24 ft
Gloves, chemical and oil protective
Goggles, industrial
Materials/Parts
Solvent, dry cleaning, item 26, appx. E
Lockwasher (6)
Locknut (1)
Locknut (4)
Locknut (4)
Locknut (6)
Locknut (8)
Tiedown straps (as required), item 27, appx. E
Equipment Condition
Gooseneck lowered to approximately 48 inches (122 cm) (para. 2-18)
4-93