TM 9-2330-381-14
CAUTION
Bolt must be fully engaged (bottomed out) in pin prior to striking with hammer or
damage to equipment may result.
11.
Install 2-inch (5.1 cm) hardened bolt into hole in bushing (13). Strike bolt with hammer. When bolt no longer can
be struck, remove bolt and install 4-inch (10.2 cm) hardened bolt. Drive out upper cylinder pin (14). Remove and
discard V-ring seal (15).
12.
Drive bushing (13) out of gooseneck cylinder (3) and gooseneck (1).
Remove V-ring seal (16) from upper
bushing (13). Discard V-ring seal.
13.
Remove lubrication fitting (17) from upper cylinder pin (14).
5-109