5-37. TUBING AND FlTTlNGS TESTING. REPAIR, AND REPLACEMENT. - Continued
c.
Installation.
(1)
Purge (para 5-8) the refrigeration system and braze (para 5-9) any loose tubing or fitting connections.
(2)
Flare tubing end where damaged flare was removed or on end of new tube if it was too short to flare.
(3)
(4)
(5)
Apply silicone RTV into evaporator frame grommets to seal evaporator enclosure.
(6)
Install insulation If removed and secure with insulation tape as necessary.
NOTE
FOLLOW-ON MAINTENANCE.
Close/install any doors, panels, guards removed.