TM 9-4110-255-14
5-28. METAL HOSE ASSEMBLY (SUCTION) REPLACEMENT .
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Equipment Conditions:
Materials/Parts:
Insulation Tape
Right side door open.
a. Removal.
(1) Remove insulation (1) as necessary.
Figure 5-24. Metal Hose Assembly
b. Installation.
(2) Install insulation (1) and secure with insulation tape as nec ssary.
e
NOTE
FOLLOW-ON MAINTENANCE:
Close right side door.
5-50