TM 9-4110-258-13
5.23 METAL HOSE ASSEMBLY (SUCTION) REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts:
Equipment Conditions:
Insulation Tape
Right side door open.
a. Removal.
(1) Remove insulation (1) as necessary.
(2) De-braze two fittings (2) (para 5.10) and remove metal hose assembly (3).
Figure 5-18. Metal Hose Assembly (Suction)
b. Installation.
(1) Install metal hose assembly (3) and braze two fittings (2) (para 5.10).
(2) Install insulation (1) and secure with insulation tape as necessary.
NOTE
FOLLOW-ON MAINTENANCE:
Close right side door.
5-44