TM 5-2420-230-10
(10) Remove holding pin, allowing arm to release.
(11) Lay spare tire and carrier assembly on the ground (Para 7-3).
(12) Rotate backhoe bucket until it releases the digging teeth from spare tire and carrier assembly.
c. Installation.
(1)
Position vehicle on level ground.
(2)
(3)
(4)
Rotate backhoe bucket until digging teeth engage spare tire and carrier assembly.
(5)
Lift and curl spare tire and carrier assembly to balanced position (Para 7-3).
(6)
Install holding pin and arm.
(7)
Install retaining clip in holding pin.
(8)
(9)
Stow backhoe assembly.
(11) Install boom locking pin.
(12) Install turnbuckles on stabilizer arms (Para 7-7).
8-10