TM 9-2330-356-14
(4) Thread lead to the inside of the junction box
WARNING
on rear of cabinet.
Ensure that forklift is properly positioned
(5) On the M970 and M970A1, do the following
under cabinet. The entire weight of the
cabinet is now on the forklift. Failure to follow
this warning may result In cabinet falling and
(a) Thread disconnected lines through the
injuring personnel.
hole at the rear of cabinet.
(b) Connect line to the flow control valve.
(9) Position a forklift and lift the cabinet slightly
to relieve pressure on the mounting screws and nuts.
(c) Connect line to the deadman hose reel.
(10) Remove eighteen mounting screws and
(d) Connect three lines to the parking brake
self-locking nuts (7, top left side; 8, top right side; and 3,
bottom left side).
(e) Install cabinet door and frame assembly.
Attach frame to hose trough and cabinet hose with ten
CAUTION
capscrews, flatwashers, and self-locking nuts.
Before removing the cabinet, ensure that all
(f) Connect the control cable to the trip bar
disconnections have been made.
on the top, left side of the cabinet.
(g) Connect the line that runs to the
(11) Lower the cabinet slightly and pull the lead
from the junction box at the rear of the cabinet.
(6) Connect the conduit to the junction box,
(12) Remove cabinet.
(7) Connect the lead to the inside of the junction
Installation.
b.
(8) Connect negative battery cables to batteries.
WARNING
(9) Operate dispensing equipment and check for
Ensure that forklift is properly positioned
under cabinet. The entire weight of the
cabinet is now on the forklift. Failure to follow
this warning may result In cabinet falling and
Injuring personnel.
Removal.
a.
NOTE
NOTE
Ensure that all lines are connected as tagged.
The 2-inch hose reel, hose reel motor, and
electrical junction box will be removed as a
unit in this procedure.
(1) Position a forklift under the hose reel cabinet.
(1) Remove hose reel cabinet from semitrailer
(2) Position hose reel cabinet under semitrailer
and fasten with eighteen capscrews and self-locking nuts
(7, top left side; 8, top right side; and 3, bottom left side).
Remove forklift.
(2) Remove 2-inch hose from reel by releasing
quick disconnect coupling.
(3) On M969 and M969A1, install split couplings
(3) Remove cover from motor junction box
to connect both inlet piping to meter inlet tubes
behind hose reel cabinet to connect inlet piping to meter
(4) Tag and disconnect leads that enter from the
inlet tube. Tighten split coupling capscrews to
top and bottom of the box.
95-105 lb.-ft.