TM 9-2330-381-14
5-21.
HYDRAULIC CONTROL MODULE FRAME (CONT)
INSTALLATION
1.
Using two people, install bottom cover assembly (3) onto hydraulic control module frame (4). Secure cover in
place by installing six capscrews (1).
2.
Position overhead lifting device over hydraulic control module frame (4). Install 24-inch hooked chain (44) onto
hydraulic control module frame (4) on side with only one mounting hole. Secure chains in place by installing
capscrew (42).
3.
Install 64-inch hooked chain (45) onto hydraulic control module frame (4) on side with two mounting holes.
Secure chain in place by installing two capscrews (42).
4.
Connect lifting device to chain (45) on hydraulic control module frame (4) and lifting device. Take up slack in
chain.
5.
Operate lifting device and start to pick up one side of hydraulic control module frame (4). Continue to operate
lifting device until frame has rolled over onto its side.
6.
Continue to reposition lifting device and roll hydraulic control module frame (4) until frame has rolled off its side
and onto bottom cover assembly (3).
7.
Make sure hydraulic control module frame is sitting firmly on bottom cover assembly. Lower lifting device and
unhook lifting device from chain (30).
8.
Connect hook on chain (44) to center of chain (45). Attach overhead lifting device to both chains (44 and 45).
Take up slack in lifting device.
9.
Raise lifting device and, if necessary, transport hydraulic control module frame (4) near front curbside of platform
for installation.
5-98