TM 9-4120-370-14
TO 35E9-229-1
REMOTE MOUNTING OF CONTROL PANEL - Continued
4-7.
NOTE
If your unit was not supplied with a block-off panel, order part (97403) 13214E3865-1.
r.
Using screwdriver and wrench, remove four screws and nuts from righthand cover plate. Remove cover plate
and install the P8 connector and harness to the block-off panel using the four screws and nuts as removed from
cover plate. Retain the cover plate for possible future use.
Reinstall conditioned air intake grille, front fresh air damper knob, and lower front panel.
s.
Fabricate an interconnecting cable/harness of the required length to connect the P8 block off mounted connec-
t.
tor and the J8 control panel connector.
Figure 4-9. Interconnecting Remote Control Cable Diagram
Install interconnecting cable.
u.
4-6. CABLE CONNECTIONS THROUGH RETURN (CONDITIONED AIR INTAKE) DUCT
This paragraph is applicable only when the conditioned air intake grille is to be removed from the unit and one or both of
used. These alternate
the alternate (Jl8 input power connector or J20 remote control connector) cable locations are to
cable connection locations permit cables to be routed through the return air ducting to the air conditioner.
Be sure input power is disconnected before doing any work inside the alr condi-
tioner cabinet. Voltages used can kill.
a<
Using allen wrench. Loosen setscrew and remove front fresh air damper control knob.