TM 9-4120-378-14
4.30 RECTIFIER-INSPECT/TEST/REPLACE. This task covers removal, inspection, test and installation.
INITIAL SETUP
Materials/Parts:
Test Equipment:
Variable voltage power source (AC/DC)
Equipment Conditions:
Action
Location/Item
Remarks
Disconnect air conditioner power source
before doing work on electrical system.
Removal
a. Tag and disconnect leads.
See fig. FO-1.
b. Remove two screws (1).
c. Remove rectifier (2) from unit.
d Remove shrink sleeving from capacitor C6 (3).
e. Desolder capacitors (3 and 4).
a. Inspect rectifier (4) for external damage.
Inspection
b. Inspect capacitors (2 and 3) for external damage.
4-76