TM 9-4120-378-14
4.31 TRANSFORMER-INSPECT/TEST/REPLACE.
This task covers removal, test replacement and installation.
INITIAL SETUP
Materials/Parts:
Test Equipment
Variable voltage power source (AC/DC)
Equipment Conditions:
Remarks
Location/Item
Action
Disconnect air conditioner power source
before doing work on electrical system.
Removal
a. Remove screws (2) and Iockwashers (1).
b. Remove shrink sleeving from two input and six
output terminals.
c. Tag and desolder all wires connected to input
See fig. FO-2. for all test
steps.
and output terminals, except for wires between
terminals 3 and 6 and 4 and 2.
4-78