TM 9-4120-378-14
SOLENOID VALVES-REPLACE. This task covers removal and installation.
INITIAL SETUP
Equipment Conditions:
Materials/Parts:
Location/ltem
Action
Remarks
Top of Housing
Avoid bodily contact with liquid refrig-
erant and avoid inhaling refrigerant
gas. Be especially careful that refrig-
erant does not come in contact with
eyes. In case of refrigerant leaks, ven-
tilate area immediately.
Check that power source is discon-
nected.
Check that system is discharged of re-
frigerant.
When performing brazing/debrazing
operations, wrap valves with wet
rags to act as a heat sink.
Disconnect electrical connector from bulkhead.
Removal
Remove plunger nut (1) and nameplate (2) from
plunger (4) and remove coil (3).
Purge system.
Debraze and remove valve