TM 55-1930-208-10
SECTION III. MAINTENANCE INSTRUCTIONS
Para.
Para.
Air Cleaner Assembly......................................... 3-15
Hose, Water ...................................................... 3-20
Control Valve ..................................................... 3-13
Hatches ............................................................. 3-5
Cranking Motor .................................................. 3-11
Hydraulic Pump ................................................. 3-12
Engine Shutdown ............................................... 3-8
Ladder ............................................................... 3-7
Ether Starting Aid ............................................... 3-23
Lighting.............................................................. 3-25
Fan Belts............................................................ 3-19
Muffler ............................................................... 3-9
Hydraulic Filter Maintenance .............................. 3-14
Oil Filter ............................................................ 3-18
Flame Screen .................................................... 3-6
Oil Pressure Gage ............................................. 3-22
Fuel Filter........................................................... 3-16
Ullage Assembly ................................................ 3-4
Fuel Strainer ...................................................... 3-17
Valve Relief ....................................................... 3-24
Hand Pump, Hydraulic ....................................... 3-10
Water Temperature Gage.................................. 3-21
3-3. GENERAL.
The following paragraphs contain operator/crew maintenance procedures for the vessel as authorized by the
Maintenance Allocation Chart (MAC).
3-4. ULLAGE ASSEMBLY MAINTENANCE.
This task covers:
a.
Removal
b.
Inspection
c.
Service
d.
Installation
SET-UP:
Tools Required:
Tool Kit, General Mechanic's
Materials Required:
Pin, Cotter P/N UL-102-14
Equipment Conditions:
3-9